Underground chemical explosive experiments such as LYNM PE1 generate large multiphenomenological datasets, require complex site preparation and build out, and utilize cutting edge models and analysis techniques to analyze and simulate the explosion-induced signals. This wide range of outcomes makes it a necessity to thoroughly characterize the testbed in advance of experiments in a way that complements the wide suite of data being generated. Here, we present a broad overview of the site characterization work and data collection that was conducted before Experiment A, which is the first in a series of three PE1 experiments. This work includes, but is not limited to, geologic mapping, physical sample collection, analysis of material properties, geophysical borehole logging, and in-situ measurements. This information was collected by a large, dedicated team and was used to inform site construction, finalize instrumentation placement, generate Geologic Framework Models, feed pre-experiment predictions, and facilitate post-experiment data analysis
Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the western system coordinating council 9-bus test system using synthetic multi-device outage scenarios.
The paper deals with a new effective numerical technique on unfitted Cartesian meshes for simulations of heterogeneous elastic materials. We develop the optimal local truncation error method (OLTEM) with 27-point stencils (similar to those for linear finite elements) for the 3-D time-independent elasticity equations with irregular interfaces. Only displacement unknowns at each internal Cartesian grid point are used. The interface conditions are added to the expression for the local truncation error and do not change the width of the stencils. The unknown stencil coefficients are calculated by the minimization of the local truncation error of the stencil equations and yield the optimal second order of accuracy for OLTEM with the 27-point stencils on unfitted Cartesian meshes. A new post-processing procedure for accurate stress calculations has been developed. Similar to basic computations it uses OLTEM with the 27-point stencils and the elasticity equations. The post-processing procedure can be easily extended to unstructured meshes and can be independently used with existing numerical techniques (e.g., with finite elements). Numerical experiments show that at an accuracy of 0.1% for stresses, OLTEM with the new post-processing procedure significantly (by 105−109 times) reduces the number of degrees of freedom compared to linear finite elements. OLTEM with the 27-point stencils yields even more accurate results than high-order finite elements with wider stencils.
Bayesian inference with a simple Gaussian error model is used to efficiently compute prediction variances for energies, forces, and stresses in the linear SNAP interatomic potential. The prediction variance is shown to have a strong correlation with the absolute error over approximately 24 orders of magnitude. Using this prediction variance, an active learning algorithm is constructed to iteratively train a potential by selecting the structures with the most uncertain properties from a pool of candidate structures. The relative importance of the energy, force, and stress errors in the objective function is shown to have a strong impact upon the trajectory of their respective net error metrics when running the active learning algorithm. Batched training of different batch sizes is also tested against singular structure updates, and it is found that batches can be used to significantly reduce the number of retraining steps required with only minor impact on the active learning trajectory.
In this paper, we present a first-order Stress-Hybrid Virtual Element Method (SH-VEM) on six-noded triangular meshes for linear plane elasticity. We adopt the Hellinger–Reissner variational principle to construct a weak equilibrium condition and a stress based projection operator. In each element, the stress projection operator is expressed in terms of the nodal displacements, which leads to a displacement based formulation. This stress-hybrid approach assumes a globally continuous displacement field while the stress field is discontinuous across each element. The stress field is initially represented by divergence-free tensor polynomials based on Airy stress functions, but we also present a formulation that uses a penalty term to enforce the element equilibrium conditions, referred to as the Penalty Stress-Hybrid Virtual Element Method (PSH-VEM). Numerical results are presented for PSH-VEM and SH-VEM, and we compare their convergence to the composite triangle FEM and B-bar VEM on benchmark problems in linear elasticity. The SH-VEM converges optimally in the L2 norm of the displacement, energy seminorm, and the L2 norm of hydrostatic stress. Furthermore, the results reveal that PSH-VEM converges in most cases at a faster rate than the expected optimal rate, but it requires the selection of a suitably chosen penalty parameter.
Monte Carlo simulations are at the heart of many high-fidelity simulations and analyses for radiation transport systems. As is the case with any complex computational model, it is important to propagate sources of input uncertainty and characterize how they affect model output. Unfortunately, uncertainty quantification (UQ) is made difficult by the stochastic variability that Monte Carlo transport solvers introduce. The standard method to avoid corrupting the UQ statistics with the transport solver noise is to increase the number of particle histories, resulting in very high computational costs. In this contribution, we propose and analyze a sampling estimator based on the law of total variance to compute UQ variance even in the presence of residual noise from Monte Carlo transport calculations. We rigorously derive the statistical properties of the new variance estimator, compare its performance to that of the standard method, and demonstrate its use on neutral particle transport model problems involving both attenuation and scattering physics. We illustrate, both analytically and numerically, the estimator's statistical performance as a function of available computational budget and the distribution of that budget between UQ samples and particle histories. We show analytically and corroborate numerically that the new estimator is unbiased, unlike the standard approach, and is more accurate and precise than the standard estimator for the same computational budget.
This manuscript presents a complete framework for the development and verification of physics-informed neural networks with application to the alternating-current power flow (ACPF) equations. Physics-informed neural networks (PINN)s have received considerable interest within power systems communities for their ability to harness underlying physical equations to produce simple neural network architectures that achieve high accuracy using limited training data. The methodology developed in this work builds on existing methods and explores new important aspects around the implementation of PINNs including: (i) obtaining operationally relevant training data, (ii) efficiently training PINNs and using pruning techniques to reduce their complexity, and (iii) globally verifying the worst-case predictions given known physical constraints. The methodology is applied to the IEEE-14 and 118 bus systems where PINNs show substantially improved accuracy in a data-limited setting and attain better guarantees with respect to worst-case predictions.