Publications

Results 5151–5200 of 101,000

Search results

Jump to search filters

NSE workplace of the future: Enabling a LPS ready workforce

Keller, Elizabeth; Landis, Lynette; Baker, Brent; Bowen, Dan; Carlson, Nils; Crone, Brian; Danielson, Tom; Fliermans, Matthew; Gupta, Rajan; Howieson, Susannah; Kelly, Rand; Kennedy, Ryan; Knepper, Paula; Lanier, Andrekka (Aj); Lennon, Sarah; Mallin, Monte; Mohagheghi, Amir H.; Orr, Marilee K.; Reed, Danielle; Riley, David; Stevens, Noah; Templeton, Dennise; Williams, Brandon; Wolf, Ambrose

The future mission success of the Nuclear Security Enterprise (NSE) relies on our workforce and our workplace. The 2022 Nuclear Posture Review notes that “the health of the enterprise depends critically on recruiting and retaining a skilled and diverse workforce” and the 2022 National Nuclear Security Administration (NNSA) Strategic Vision articulates a commitment to “recruit, invest in, and nourish a high-performing, diverse, and flexible workforce that can meet the unique policy, technical, and leadership needs of our mission today and well into the future.”

More Details

Stormwater Pollution Prevention Plan (SWPPP) for Site Wide Landscaping Project

Manger, Trevor J.; Wright, Keir

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the SNL/CA Site Landscaping Project at Sandia National Laboratories/California (SNL/CA), 7011 East Avenue, Livermore, California (SNL/CA). The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia (NTESS), LLC. The project proposes landscape improvements throughout SNL/CA. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

More Details

On the constitutive stress-strain relationships and evaluation of the softening coefficient in work hardening mechanisms

Jankowski, Alan F.

The constitutive stress-strain relationships for structural alloys, such as additively manufactured Ti- 6Al-4V, are reconstructed by assessing the form and mechanism of work hardening relationships. The stress-strain relationships are best fit using both the Hollomon and Voce expressions wherein the Voce expression well-reproduces the later stage(s) of work hardening whereas the Hollomon relationship provides a better fit just beyond the proportional limit.

More Details

MACCS User Guide (V.4.2)

Clayton, Daniel J.

MACCS is used by the Nuclear Regulatory Commission (NRC) and various national and international organizations for probabilistic consequence analysis of nuclear power accidents. This User Guide is intended to assist analysts in understanding the MACCS/WinMACCS model and to provide information regarding the code. This user guide version describes MACCS Version 4.2. This User Guide provides a brief description of the model history, explains how to set up and execute a problem, and informs the user of the definition of various input parameters and any constraints placed on those parameters. This report is part of a series of reports documenting MACCS. Other reports include the MACCS Theory Manual, MACCS Verification Report, Technical Bases for Consequence Analyses Using MACCS, as well as documentation for preprocessor codes including SecPop, MelMACCS, and COMIDA2.

More Details

Laser Welded Burst Disk Weld Tooling

Roberts, Matthew M.

A production run of 5550 hermetically sealed cylinder assemblies with precision pressure relief burst discs will be assembled and laser welded at a manufacturing lab at Sandia National Labs. Production of these cylinder assemblies requires many steps, including piece part machining, geometric inspection, cleaning, subassembly, complete assembly via laser welding, and finally leak checking. While this production run is large enough to invest in process optimization and specialized tooling, it is not quite large enough to dedicate new lab space and specify equipment specifically for this job. This study will investigate process parameters and their effects on quality and process flow time, as well as a fixturing design study with the goal of reducing process time while maintaining quality requirements.

More Details
Results 5151–5200 of 101,000
Results 5151–5200 of 101,000
Top