Design, Development, & Test Project, Task 3 Aerospace Safety Flight Test
Project authorization, program status, and planned expenditures.
Project authorization, program status, and planned expenditures.
Abstract not provided.
Flight tests (for SNAP) rescheduling: laboratory test run-throughs of complete flight test re-entry systems with all live hardware, tower drops into water for evaluations of impact switches and flotation gear, RV radiant heat test, sled tests, air drops.
About fuel capsule testing for SNAP program.
About the SNAP-11 system mission requirements and safety.
Concerns and study needs about nuclear weapons was listed. A meeting to delineate and outline major areas of technical uncertainty relating to weapon vulnerability was proposed.
Abstract not provided.
Abstract not provided.
Specifies requirements to obtain information for a book about the vulnerability of the ICBM and IRBM systems.
Abstract not provided.
Project purpose summary and spending purpose expectations.
Notes about a meeting about instrumentation development.
Discussion of findings after the shot in the tunnel and instructions for a deeper drilling below the tunnel using radiation probes to help define the cavity shape and documentary photography of the findings.
This was for forwarding to the Geneva Conference with the Soviet Union representatives about underground explosion tests.
Abstract not provided.
The Salton Sea Test Base, the Yucca Lake at Nevada Proving Ground, the Clovis Bombing Range area, the Navajo reservation land northwest of Winslow, Arizona, and areas in New Mexico were considered for a new weapons` testing range.
Results of the three heat paper runs made on the paper machine for use in Unit MC-818 and other tests results.
It summarizes the structural and electrical integration of the Minuteman.
To determine the structural adequacy of the XH-735 used in conjunction with the XH-741 & XH-742, two separate tests were performed. Stimulated lifting loads was done.
Sandia Corporation`s plans and possible problems during nuclear test moratorium.
Abstract not provided.
Abstract not provided.
Abstract not provided.
AEC was given exclusive use and occupancy of the assembly building and the appurtenant structures which had bee constructed with AEC funds. It was to furnish fire protection and maintenance of the facilities.
photographs
Abstract not provided.
Abstract not provided.
Results of a meeting for the purpose of coordination and discussion of test plans at Tonapah. Participants were engineers responsible for the field test, engineering, launcher, handling equipment, and aerodynamics of the test rockets.
Results of a meeting for the purpose of coordination and discussion of engineering problems involved. Participants were engineers responsible for the field test, engineering, launcher, handling equipment, and aerodynamics of the test rockets.
About neutron detector needs for beneath the shot cap on Kickapoo, inside the Mk 5s and
This project was to provide field troops with an active defense against V-2 type ballistic missiles, free-fall bombs, Hones John-type missiles, and Corporal-type missiles.
AEC was given exclusive use and occupancy of the assembly building and the appurtenant structures which had bee constructed with AEC funds. It was to furnish fire protection and maintenance of the facilities.
About the maintenance spares support plan, spare parts provisioning for supplier items, AFSWP_AEC spare parts provisioning system; certification of multiple application test equipment, road material special equipment catalogs, Class A & B weapons groups.
An early plan, prepared at request of AEC for integration operation and management of weapon component production facilities. Proposed management responsibility for Sandia.
A memo about relative work loads.
Abstract not provided.
AEC was given exclusive use and occupancy of the assembly building and the appurtenant structures which had bee constructed with AEC funds. It was to furnish fire protection and maintenance of the facilities.
AEC was given exclusive use and occupancy of the assembly building and the appurtenant structures which had bee constructed with AEC funds. It was to furnish fire protection and maintenance of the facilities.
Abstract not provided.
The agreed to procedure.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
An agreement between Los Alamos Scientific Laboratory, Sandia Corporation, and the Atomic Energy Commission.
Comparison of riveted vs. welded bomb case. Factors considered: design performance, single design, time scale, weight, and source. Conclusion and recommendations.
Abstract not provided.