Sandia Lab News

New lab offers mobile testing for devices that turn ocean waves into electricity

A new Labs facility — the Sandia Wave Energy Power Take-Off (SWEPT) Lab — offers mobile, specialized testing for systems that produce power from wave energy. Marine and hydrokinetic technologies convert the energy of waves, tides and river and ocean currents into electricity, creating the potential to provide millions with locally sourced, renewable and reliable energy.

Flying from the glass

Bird strikes against windows are an all-too-familiar sound. To birds, the transparent glass looks like open space, and between 500 million and 1 billion birds die each year trying to fly through closed windows. Sandia is solving this problem at one of its high-strike buildings, where ecology program staff partnered with facilities staff to place adhesives featuring a dot pattern on the building's windows.

‘MANOS’ needs a hand

Many of us can thank a teacher or mentor who early in our lives ignited in us a passion for our current professions. Sandia’s Manos — or “hands-on” — program is looking for the next generation of Sandia volunteer mentors to provide that spark for science, technology, engineering and math in local middle school students.

Extreme fast-charging batteries

A key roadblock to widespread use of long-range electric vehicles — the longer time needed for a complete recharge compared to a gas station fill-up — may soon be overcome, thanks to DOE support for extreme fast-charging battery research. Fueled by a $1.5 million award from DOE’s Vehicle Technology Office, Sandia and the University of Michigan have teamed up to develop engineered battery materials that can be charged in less than 10 minutes.

Power to spare: New Battery Test Facility boosts work of power sources team, with big benefits for customers

When Sandia tests the performance of high-capacity energy storage devices, the power sources group frequently would hit obstacles that reduced efficiencies and stretched out schedules. Those obstacles have now been removed with the construction of a 7,500 square-foot Battery Test Facility that enables the team to assemble and test batteries more efficiently for customers to validate whether they perform up to expectations.