[No title. Is about a possible critical assembly.]
Abstract not provided.
Abstract not provided.
Fallout predictions of fission products resulting from a hypothetical nuclear test (for possible resumption of above ground testing). Giant Squid test was never conducted.
Concerns about DASA difficulties in meeting its schedules for full scale nuclear tests. The latter was under heavy pressure from the Stennis Committee.
Abstract not provided.
A report about the testing of 13 SNAP 15C fuel capsules furnished by Nuclear Products Division of the Minnesota Mining and Manufacturing Company.
A report about fallout of plutonium particles and trajectory studies.
Brief statements about the following: Salmon, Boobie, Handcar, Mudpack, Mudpack, Slice, Pahute Mesa Instrumentation, Piledriver, Tar and Sand, Pickaxe, Tonopah Test Range tests, Coyote Test Field Operation, Tiny Tot, Gumdrop, and Hydyme.
This is a summary of tests Thunderpipe, Thunderwell, and Tundertube tests in the Coyote
Abstract not provided.
Sandia agreed to determine test velocities and temperatures and propose a test sequence for the 15 aerodynamically unstable capsules.
Abstract not provided.
Quotes the Cook to Reeves TWX which discussed the understanding of the treaty ending nuclear tests, need for taking into account meteorology in connection with underground explosions, and a statement of successful stemming of tests.
Discusses understanding of the treaty ending nuclear tests, need for taking into account meteorology in connection with underground explosions, and a statement of successful stemming of tests.
Letter of transmittal for SOW pertaining to stockpile testing of W48/M454 system.
Comments on SNAP-9 mission and related space nuclear power safety concerns.
A response to two memos-- concerns about inexperience in the generation and photographic study of extremely strong shocks which were of interest to the Bagpipe-ARES programs made it difficult to specify just what unique date was expected.
This is just a lits of items for the meeting.
A proposed review and technical objectives development program of Sandia Corporation plans for weapons effects test activities along with their funding requirements, etc.
Mr. Cook states his interest in the specific technical objectives of the planned horizontal asymmetry shot, the arguments for placing it above the high yield scaling test, and of the apparent interest in E. Teller`s interest.
A mathematical developed probabilities chart to show the effect of different mixes of weapons and decoys (or the equivalent in other penetration aids).
About a new facility and construction expenses. It was to be for experimenting in relation to space nuclear power safety re-entry concerns.
Report about space flight testing & SNAP related safety items.
Space power/nuclear powered missile flight test scheduling and purpose of the trip.
Abstract not provided.
Project authorization, program status, and planned expenditures.
Project authorization, program status, and planned expenditures.
Project authorization, program status, and planned expenditures.
Abstract not provided.
About fuel capsule testing for SNAP program.
About the SNAP-11 system mission requirements and safety.
Concerns and study needs about nuclear weapons was listed. A meeting to delineate and outline major areas of technical uncertainty relating to weapon vulnerability was proposed.
Abstract not provided.
Abstract not provided.
Specifies requirements to obtain information for a book about the vulnerability of the ICBM and IRBM systems.
Abstract not provided.
Discussion of findings after the shot in the tunnel and instructions for a deeper drilling below the tunnel using radiation probes to help define the cavity shape and documentary photography of the findings.
This was for forwarding to the Geneva Conference with the Soviet Union representatives about underground explosion tests.
Abstract not provided.
The Salton Sea Test Base, the Yucca Lake at Nevada Proving Ground, the Clovis Bombing Range area, the Navajo reservation land northwest of Winslow, Arizona, and areas in New Mexico were considered for a new weapons` testing range.
Results of the three heat paper runs made on the paper machine for use in Unit MC-818 and other tests results.
It summarizes the structural and electrical integration of the Minuteman.
To determine the structural adequacy of the XH-735 used in conjunction with the XH-741 & XH-742, two separate tests were performed. Stimulated lifting loads was done.
Sandia Corporation`s plans and possible problems during nuclear test moratorium.
Abstract not provided.
Abstract not provided.
AEC was given exclusive use and occupancy of the assembly building and the appurtenant structures which had bee constructed with AEC funds. It was to furnish fire protection and maintenance of the facilities.
photographs
Abstract not provided.
Abstract not provided.
Results of a meeting for the purpose of coordination and discussion of test plans at Tonapah. Participants were engineers responsible for the field test, engineering, launcher, handling equipment, and aerodynamics of the test rockets.
Results of a meeting for the purpose of coordination and discussion of engineering problems involved. Participants were engineers responsible for the field test, engineering, launcher, handling equipment, and aerodynamics of the test rockets.
About neutron detector needs for beneath the shot cap on Kickapoo, inside the Mk 5s and
This project was to provide field troops with an active defense against V-2 type ballistic missiles, free-fall bombs, Hones John-type missiles, and Corporal-type missiles.
AEC was given exclusive use and occupancy of the assembly building and the appurtenant structures which had bee constructed with AEC funds. It was to furnish fire protection and maintenance of the facilities.
About the maintenance spares support plan, spare parts provisioning for supplier items, AFSWP_AEC spare parts provisioning system; certification of multiple application test equipment, road material special equipment catalogs, Class A & B weapons groups.
An early plan, prepared at request of AEC for integration operation and management of weapon component production facilities. Proposed management responsibility for Sandia.
A memo about relative work loads.
Abstract not provided.
AEC was given exclusive use and occupancy of the assembly building and the appurtenant structures which had bee constructed with AEC funds. It was to furnish fire protection and maintenance of the facilities.
AEC was given exclusive use and occupancy of the assembly building and the appurtenant structures which had bee constructed with AEC funds. It was to furnish fire protection and maintenance of the facilities.
Abstract not provided.
The agreed to procedure.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
An agreement between Los Alamos Scientific Laboratory, Sandia Corporation, and the Atomic Energy Commission.
Comparison of riveted vs. welded bomb case. Factors considered: design performance, single design, time scale, weight, and source. Conclusion and recommendations.
Abstract not provided.