Publications

2 Results

Search results

Jump to search filters

Setup and Testing of the RS105 Wire Array Pulser

Rashkin, Lee J.; Bowman, Tyler; Baker, Nicholas S.; Oliveira, Matthew P.H.; Bean, Ian A.

The report covers the RS105 Wire Array Pulser testbed. The setup of the wire array at Reapplication, building 996, is laid out. Setup instructions are provided. Details of the commissioning test are given. Measurement data from the commissioning test shows the field output of the array exceeds 50 kV/m and that tuning the pulser output with a peaking switch can provide a rise time of ~2.3 ns and a pulse width of ~23 ns. The field levels and timeframes shown are within the tolerance conditions of

More Details

4.5m GTEM RS105 Test Capability Commissioning

Bowman, Tyler; Baker, Nicholas S.; Oliveira, Matthew P.H.; Nelson, Howard W.

This work details the reconfiguration of the 4.5 m Gigahertz Transverse Electromagnetic test facility at Sandia National Laboratories to operate in accordance with the RS105 (radiated susceptibility) test from MIL-STD-461 representing a high-altitude electromagnetic pulse. This reconfiguration involved removal of the existing continuous wave source and connecting both a high voltage feed and a coaxial feed housing the Marx bank pulser. Marx control settings were calibrated for several voltage levels across two pulsers, and position-dependent measurements of the peak electric field were taken throughout the test volume for each pulser. The results showed field uniformity and purity across the test volume comparable to continuous wave operations, and field peaks were measured from 1.63 kV/m to 54.8 kV/m, with maximum capabilities expected to exceed 100 kV/m. Some challenges in consistent pulser operations at lower Marx bank voltages and high frequency reflections in the system were identified for future capability improvements.

More Details
2 Results
2 Results
Top