Setup and Testing of the RS105 Wire Array Pulser
Rashkin, Lee J.; Bowman, Tyler; Baker, Nicholas S.; Oliveira, Matthew P.H.; Bean, Ian A.
The report covers the RS105 Wire Array Pulser testbed. The setup of the wire array at Reapplication, building 996, is laid out. Setup instructions are provided. Details of the commissioning test are given. Measurement data from the commissioning test shows the field output of the array exceeds 50 kV/m and that tuning the pulser output with a peaking switch can provide a rise time of ~2.3 ns and a pulse width of ~23 ns. The field levels and timeframes shown are within the tolerance conditions of