Profitability of Merchant Investments in Battery Energy Storage Systems: Methods and Case Studies
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
INFORMS Journal on Computing
We provide a comprehensive overview of mixed-integer programming formulations for the unit commitment (UC) problem. UC formulations have been an especially active area of research over the past 12 years due to their practical importance in power grid operations, and this paper serves as a capstone for this line of work. We additionally provide publicly available reference implementations of all formulations examined. We computationally test existing and novel UC formulations on a suite of instances drawn from both academic and real-world data sources. Driven by our computational experience from this and previous work, we contribute some additional formulations for both generator production upper bounds and piecewise linear production costs. By composing new UC formulations using existing components found in the literature and new components introduced in this paper, we demonstrate that performance can be significantly improved—and in the process, we identify a new state-of-the-art UC formulation.
Computational Management Science
Here, we introduce a novel chance-constrained stochastic unit commitment model to address uncertainty in renewables' production uncertainty in power systems operation. For most thermal generators,underlying technical constraints that are universally treated as "hard" by deterministic unit commitment models are in fact based on engineering judgments, such that system operators can periodically request operation outside these limits in non-nominal situations, e.g., to ensure reliability. We incorporate this practical consideration into a chance-constrained stochastic unit commitment model, specifically by in-frequently allowing minor deviations from the minimum and maximum thermal generator power output levels. We demonstrate that an extensive form of our model is computationally tractable for medium-sized power systems given modest numbers of scenarios for renewables' production. We show that the model is able to potentially save significant annual production costs by allowing infrequent and controlled violation of the traditionally hard bounds imposed on thermal generator production limits. Finally, we conduct a sensitivity analysis of optimal solutions to our model under two restricted regimes and observe similar qualitative results.
Mathematical Programming Computation
We present a novel formulation for startup cost computation in the unit commitment problem (UC). Both our proposed formulation and existing formulations in the literature are placed in a formal, theoretical dominance hierarchy based on their respective linear programming relaxations. Our proposed formulation is tested empirically against existing formulations on large-scale UC instances drawn from real-world data. While requiring more variables than the current state-of-the-art formulation, our proposed formulation requires fewer constraints, and is empirically demonstrated to be as tight as a perfect formulation for startup costs. This tightening can reduce the computational burden in comparison to existing formulations, especially for UC instances with large reserve margins and high penetration levels of renewables.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Optimization Letters
We consider a joint-chance constraint (JCC) as a union of sets, and approximate this union using bounds from classical probability theory. When these bounds are used in an optimization model constrained by the JCC, we obtain corresponding upper and lower bounds on the optimal objective function value. We compare the strength of these bounds against each other under two different sampling schemes, and observe that a larger correlation between the uncertainties tends to result in more computationally challenging optimization models. We also observe the same set of inequalities to provide the tightest upper and lower bounds in our computational experiments.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Optimization Letters
We consider a joint-chance constraint (JCC) as a union of sets, and approximate this union using bounds from classical probability theory. When these bounds are used in an optimization model constrained by the JCC, we obtain corresponding upper and lower bounds on the optimal objective function value. We compare the strength of these bounds against each other under two different sampling schemes, and observe that a larger correlation between the uncertainties tends to result in more computationally challenging optimization models. We also observe the same set of inequalities to provide the tightest upper and lower bounds in our computational experiments.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
IEEE Transactions on Power Systems
We propose a novel global solution algorithm for the network-constrained unit commitment problem that incorporates a nonlinear alternating current (ac) model of the transmission network, which is a nonconvex mixed-integer nonlinear programming problem. Our algorithm is based on the multi-tree global optimization methodology, which iterates between a mixed-integer lower-bounding problem and a nonlinear upper-bounding problem. We exploit the mathematical structure of the unit commitment problem with ac power flow constraints and leverage second-order cone relaxations, piecewise outer approximations, and optimization-based bounds tightening to provide a globally optimal solution at convergence. Numerical results on four benchmark problems illustrate the effectiveness of our algorithm, both in terms of convergence rate and solution quality.
Abstract not provided.
Optimization Letters
We consider a joint-chance constraint (JCC) as a union of sets, and approximate this union using bounds from classical probability theory. When these bounds are used in an optimization model constrained by the JCC, we obtain corresponding upper and lower bounds on the optimal objective function value. We compare the strength of these bounds against each other under two different sampling schemes, and observe that a larger correlation between the uncertainties tends to result in more computationally challenging optimization models. We also observe the same set of inequalities to provide the tightest upper and lower bounds in our computational experiments.
Abstract not provided.
AIChE Journal
While peak shaving is commonly used to reduce power costs, chemical process facilities that can reduce power consumption on demand during emergencies (e.g., extreme weather events) bring additional value through improved resilience. For process facilities to effectively negotiate demand response (DR) contracts and make investment decisions regarding flexibility, they need to quantify their additional value to the grid. We present a grid–centric mixed–integer stochastic programming framework to determine the value of DR for improving grid resilience in place of capital investments that can be cost prohibitive for system operators. We formulate problems using both a linear approximation and a nonlinear alternating current power flow model. Our numerical results with both models demonstrate that DR can be used to reduce the capital investment necessary for resilience, increasing the value that chemical process facilities bring through DR. Furthermore, the linearized model often underestimates the amount of DR needed in our case studies.
Abstract not provided.