Targeted Evaluation of Utility-Scale and Distributed Solar Forecasting
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Conference Record of the IEEE Photovoltaic Specialists Conference
Abstract not provided.
Abstract not provided.
Often PV hosting capacity analysis is performed for a limited number of distribution feeders. For medium - voltage distribution feeders, previous results generally analyze less than 20 feeders, and then the results are extrapolated out to similar types of feeders. Previous hosting capacity research has often focused on determining a single value for the hosting capacity for the entire feeder, whereas this research expands previous hosting capacity work to investigate all the regions of the feeder that may allow many different hosting capacity values wit h an idea called locational hosting capacity (LHC)to determine the largest PV size that can be interconnected at different locations (buses) on the study feeders. This report discusses novel methods for analyzing PV interconnections with advanced simulati on methods. The focus is feeder and location - specific impacts of PV that determine the locational PV hosting capacity. Feeder PV impact signature are used to more precisely determine the local maximum hosting capacity of individual areas of the feeder. T he feeder signature provides improved interconnection screening with certain zones that show the risk of impact to the distribution feeder from PV interconnections.
This report investigates the fault current contribution from a single large PV system and the impact it has on existing distribution overcurrent protection devices. Assumptions are made about the modeling of the PV system under fault to perform exhaustive steady - state fault analyses throughout distribution feeder models. Each PV interconnection location is tested to determine how the size of the PV system affects the fault current measured by each protection device. This data is then searched for logical conditions that indicate whether a protection device has operated in a manner that will cause more customer outages due to the addition of the PV system. This is referred to as a protection issue , and there are four unique types of issues that have been identified in the study. The PV system size at which any issues occur are recorded to determine the feeder's PV hosting capacity limitations due to interference with protection settings. The analysis is carried out on six feeder models. The report concludes with a discussion of the prevalence and cause of each protection issue caused by PV system fault current.
Abstract not provided.
Abstract not provided.
2017 IEEE 44th Photovoltaic Specialist Conference, PVSC 2017
This paper describes methods that a distribution engineer could use to determine advanced inverter settings to improve distribution system performance. These settings are for fixed power factor, volt-var, and volt-watt functionality. Depending on the level of detail that is desired, different methods are proposed to determine single settings applicable for all advanced inverters on a feeder or unique settings for each individual inverter. Seven distinctly different utility distribution feeders are analyzed to simulate the potential benefit in terms of hosting capacity, system losses, and reactive power attained with each method to determine the advanced inverter settings.
2017 IEEE 44th Photovoltaic Specialist Conference Pvsc 2017
This paper describes methods that a distribution engineer could use to determine advanced inverter settings to improve distribution system performance. These settings are for fixed power factor, volt-var, and volt-watt functionality. Depending on the level of detail that is desired, different methods are proposed to determine single settings applicable for all advanced inverters on a feeder or unique settings for each individual inverter. Seven distinctly different utility distribution feeders are analyzed to simulate the potential benefit in terms of hosting capacity, system losses, and reactive power attained with each method to determine the advanced inverter settings.
2017 IEEE 44th Photovoltaic Specialist Conference, PVSC 2017
A control algorithm is designed to smooth the variability of PV power output using distributed batteries. The tradeoff between smoothing and battery size is shown. It is also demonstrated that large numbers of highly distributed current, voltage, and irradiance sensors can be utilized to control the distributed storage in a more optimal manner. It is also demonstrated that centralized energy storage control for PV ramp rate smoothing requires very fast communication, typically less than a 15-second update rate. Finally, advanced inverter dynamic reactive current is shown to provide voltage variability smoothing, hence reducing the number of voltage regulator tap changes without energy storage.
2017 IEEE 44th Photovoltaic Specialist Conference, PVSC 2017
A control algorithm is designed to smooth the variability of PV power output using distributed batteries. The tradeoff between smoothing and battery size is shown. It is also demonstrated that large numbers of highly distributed current, voltage, and irradiance sensors can be utilized to control the distributed storage in a more optimal manner. It is also demonstrated that centralized energy storage control for PV ramp rate smoothing requires very fast communication, typically less than a 15-second update rate. Finally, advanced inverter dynamic reactive current is shown to provide voltage variability smoothing, hence reducing the number of voltage regulator tap changes without energy storage.
2017 IEEE 44th Photovoltaic Specialist Conference, PVSC 2017
The research presented in this paper compares five real-time control strategies for the power output of a large number of distributed PV systems in a large distribution feeder circuit. Both real and reactive power controls are considered with the goal of minimizing network over-voltage violations caused by high penetrations of PV generation. The control parameters are adjusted to maximize the effectiveness of each control. The controls are then compared based on their ability to achieve multiple objectives. These objectives include minimizing the total number of voltage violations, minimizing the total amount of PV energy curtailed or reactive power generated, and maximizing the fairness of any control action among all PV systems. The controls are simulated on the OpenDSS platform using time series load and spatially-distributed irradiance data.
Abstract not provided.
Abstract not provided.
IEEE Power and Energy Society General Meeting
As PV penetration on the distribution system increases, there is growing concern about how much PV each feeder can handle. A total of 216 medium-voltage distributions feeders have been analyzed in detail for their individual PV hosting capacity and the locational PV hosting capacity at all the buses on the feeder. A statistical analysis is performed on the hosting capacity results in order to compare correlation with feeder load, percent of issues caused, and the variation for different feeder voltages. Due to the large number of distribution systems simulated, the analysis provides novel insights into each of these areas. Investigating the locational PV hosting capacity also expands the conventional analytical methods that study only the worst-case PV scenario.
Abstract not provided.
IEEE Transactions on Smart Grid
Efficient management and coordination of distributed energy resources with advanced automation schemes requires accurate distribution system modeling and monitoring. Big data from smart meters and photovoltaic (PV) micro-inverters can be leveraged to calibrate existing utility models. This paper presents computationally efficient distribution system parameter estimation algorithms to improve the accuracy of existing utility feeder radial secondary circuit model parameters. The method is demonstrated using a real utility feeder model with advanced metering infrastructure (AMI) and PV micro-inverters, along with alternative parameter estimation approaches that can be used to improve secondary circuit models when limited measurement data is available. The parameter estimation accuracy is demonstrated for both a three-phase test circuit with typical secondary circuit topologies and single-phase secondary circuits in a real mixed-phase test system.
Abstract not provided.
The fourth solicitation of the California Solar Initiative (CSI) Research, Development, Demonstration and Deployment (RD&D) Program established by the California Public Utilities Commission (CPUC) supported the Electric Power Research Institute (EPRI), National Renewable Energy Laboratory (NREL), and Sandia National Laboratories (SNL) with data provided from Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E) conducted research to determine optimal default settings for distributed energy resource advanced inverter controls. The inverter functions studied are aligned with those developed by the California Smart Inverter Working Group (SIWG) and those being considered by the IEEE 1547 Working Group. The advanced inverter controls examined to improve the distribution system response included power factor, volt-var, and volt-watt. The advanced inverter controls examined to improve the transmission system response included frequency and voltage ride-through as well as Dynamic Voltage Support. This CSI RD&D project accomplished the task of developing methods to derive distribution focused advanced inverter control settings, selecting a diverse set of feeders to evaluate the methods through detailed analysis, and evaluating the effectiveness of each method developed. Inverter settings focused on the transmission system performance were also evaluated and verified. Based on the findings of this work, the suggested advanced inverter settings and methods to determine settings can be used to improve the accommodation of distributed energy resources (PV specifically). The voltage impact from PV can be mitigated using power factor, volt-var, or volt-watt control, while the bulk system impact can be improved with frequency/voltage ride-through.
Abstract not provided.
Abstract not provided.
IEEE Power & Energy Society General Meeting (Online)
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Utilities are increasingly concerned about the potential negative impacts distributed PV may have on the operational integrity of their distribution feeders. Some have proposed novel methods for controlling a PV system's grid - tie inverter to mitigate poten tial PV - induced problems. This report investigates the effectiveness of several of these PV advanced inverter controls on improving distribution feeder operational metrics. The controls are simulated on a large PV system interconnected at several locations within two realistic distribution feeder models. Due to the time - domain nature of the advanced inverter controls, quasi - static time series simulations are performed under one week of representative variable irradiance and load data for each feeder. A para metric study is performed on each control type to determine how well certain measurable network metrics improve as a function of the control parameters. This methodology is used to determine appropriate advanced inverter settings for each location on the f eeder and overall for any interconnection location on the feeder.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
From 2010 through the first half of 2015, the installed capacity of solar photovoltaics (PV) connected to the U.S. distribution system increased sixfold, from approximately 1.8 GW to more than 11 GW. This accounts for over half of the approximate total U.S. solar installations of 20 GW. Distributed generation from PV (DGPV) is expected to comprise 50%–60% of total U.S. PV capacity through at least 2020. The rapid deployment of high penetrations of DGPV into the distribution system has both highlighted challenges and demonstrated many successful examples of integrating higher penetration levels than previously thought possible. In this report, we analyze challenges, solutions, and research needs in the context of DGPV deployment to date and the much higher levels of integration that are expected with the achievement of the U.S. Department of Energy’s SunShot targets.
Abstract not provided.
Abstract not provided.
The Task 1 objective is to “expedite the PV interconnection process by revising the screening process in California”. The goal of this task is to develop a data-driven, validated approach to determining feeder limits that can simplify interconnection processes and lead to greater PV adoption across the California distribution system.
This task describes R&D activities to establish methods to cost-effectively achieve very high PV penetration scenarios (well beyond 100% of peak load at the feeder level) by leveraging distributed inverters to increase situational awareness and provide local voltage support. The grid performance and reliability objectives (SI vision) of this proposal were selected to enhance feeder planning models that can better characterize and quantify the electric power system including the secondary system servicing customers. The Communication objective was selected to demonstrate how visibility and control of behind-the-meter systems and distributed storage at large scale can be optimized to address system reliability and variability impacts, and to maximize the value of solar in high PV penetration scenarios. The goal of this project was to achieve enhanced grid operation and optimized PV penetration utilizing highly distributed sensor data via three subtasks 1.1-1.3.
The research presented in this report compares several real - time control strategies for the power output of a large number of PV distributed throughout a large distribution feeder circuit. Both real and reactive power controls are considered with the goal of minimizing network over - voltage violations caused by large amounts of PV generation. Several control strategies are considered under various assumptions regarding the existence and latency of a communication network. The control parameters are adjusted to maximize the effectiveness of each control. The controls are then compared based on their ability to achieve multiple objectiv es. These objectives include minimizing the total number of voltage violations , minimizing the total amount of PV energy curtailed or reactive power generated, and maximizing the fairness of any control action among all PV systems . The controls are simulat ed on the OpenDSS platform using time series load and spatially - distributed irradiance data.
2015 IEEE 42nd Photovoltaic Specialist Conference, PVSC 2015
Utilities issuing new PV interconnection permits must be aware of any risks caused by PV on their distribution networks. One potential risk is the degradation of the effectiveness of the network's protection devices (PDs). This can limit the amount of PV allowed in the network, i.e. the network's PV hosting capacity. This research studies how the size and location of a PV installation can prevent network PDs from operating as intended. Simulations are carried out using data from multiple actual distribution feeders in OpenDSS. The PD TCC are modeled to find the timing of PD tripping to accurately identify when PV will cause unnecessary customer outages. The findings show that more aggressive protection settings limit the amount of PV that can be placed on a network that does not cause more customer outages or damage network equipment.
2015 IEEE 42nd Photovoltaic Specialist Conference, PVSC 2015
Most utilities use a standard small generator interconnection procedure (SGIP) process that includes a screen for placing potential PV interconnection requests on a fast track that do not require more detailed study. One common screening threshold is the 15% of peak load screen that fast tracks PV below a certain size. This paper performs a technical evaluation of the screen compared to a large number of simulation results for PV on 40 different feeders. Three error metrics are developed to quantify the accuracy of the screen for identifying interconnections that would cause problems or incorrectly sending a large number of allowable systems for more detailed study.
2015 IEEE 42nd Photovoltaic Specialist Conference, PVSC 2015
With increasingly high penetrations of PV on distribution systems, there can be many benefits and impacts to the standard operation of the grid. This paper focuses on voltages below the allowable range caused by the installation of PV on distribution systems with line-drop compensation enabled voltage regulation controls. This paper demonstrates how this type of under-voltage issue has the potential to limit the hosting capacity of PV on a feeder and have possible consequences to other feeders served off a common regulated bus. Some examples of mitigation strategies are presented, along with the shortcomings of each. An example of advanced inverter functionality to mitigate overvoltage is shown, while also illustrating the ineffectiveness of inverter voltage control as a mitigation of under-voltage.
2015 IEEE 42nd Photovoltaic Specialist Conference, PVSC 2015
Utilities issuing new PV interconnection permits must be aware of any risks caused by PV on their distribution networks. One potential risk is the degradation of the effectiveness of the network's protection devices (PDs). This can limit the amount of PV allowed in the network, i.e. the network's PV hosting capacity. This research studies how the size and location of a PV installation can prevent network PDs from operating as intended. Simulations are carried out using data from multiple actual distribution feeders in OpenDSS. The PD TCC are modeled to find the timing of PD tripping to accurately identify when PV will cause unnecessary customer outages. The findings show that more aggressive protection settings limit the amount of PV that can be placed on a network that does not cause more customer outages or damage network equipment.