Publications

Results 126–150 of 181

Search results

Jump to search filters

IDC Use Case Model Survey Version 1.1

Harris, James M.; Carr, Dorthe B.

This document contains the brief descriptions for the actors and use cases contained in the IDC Use Case Model. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 SNL IDC Reengineering Project Team Initial delivery M. Harris V1.1 2/2015 SNL IDC Reengineering Project Team Iteration I2 Review Comments M. Harris

More Details

IDC System Specification Document Version 1.1

Harris, James M.; Lober, Randy R.

This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Reengineering Phase 2 project. Revisions Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Reengineering Project Team Initial delivery M. Harris V1.1 2/2015 IDC Reengineering Project Team Iteration I2 Review Comments M. Harris

More Details

IDC Reengineering Phase 2 Project Scope

Harris, James M.

The Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) operates the International Data Centre (IDC) to support treaty verification activities by Member States. The IDC collects, stores, processes, and distributes data from seismic, hydroacoustic, infrasound, and radionuclide stations. A significant component of the IDC is the seismic, hydroacoustic, and infrasound (SHI) processing system. The IDC has recognized the need to reengineer the SHI processing system and has defined a three-phase reengineering effort. IDC Reengineering Phase 1 (RP1) started in 2011 with the goal to significantly modernize SHI automatic and interactive data processing software, focusing on enhancements to individual components of the system. Reengineering Phase 2 (RP2), started in 2014, addresses the task of specifying a unified architecture for all SHI software, across processing stages, to pave the way for further software development and sustainment in the future. A key objective of RP2 is an architecture sufficient to provide a basis for a cost estimate for the development or enhancement of the software components and subsystems. This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system.This report expands upon the “Scope for IDC Reengineering Phase 2”, July 2014, ECS-DIS-WGB-43-PTS-MATERIAL-12-ADD-1, produced by the IDC.

More Details

IDC reengineering Phase 2 & 3 US industry standard cost estimate summary

Harris, James M.; Huelskamp, Robert M.

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

More Details
Results 126–150 of 181
Results 126–150 of 181