Publications

25 Results

Search results

Jump to search filters

IDC Re-Engineering Phase 2 Iteration E2. Draft Component Interface Specification: Signal Detection Control

Hamlet, Benjamin R.; Prescott, Ryan M.; Burns, John F.; Kubica, Steven M.

This report contains a draft Component Interface Specification (CIS) for an application controlling signal detection calculations. It is an example of the contents and level of detail of information in a CIS. The classes, interfaces, and data types in this report reflect current understanding of system concepts and potential implementation patterns but should not be interpreted as containing the finalized interface specifications, classes, etc. The primary purpose of this report is to discuss the potential OSD APIs represented in class diagrams for the Waveform, QC Mask, and Signal Detection Repository interfaces.

More Details

IDC Re-Engineering Phase 2 Iteration E2. Draft Component Interface Specification

Hamlet, Benjamin R.; Prescott, Ryan M.; Burns, John F.; Kubica, Steven M.

This report contains a draft Component Interface Specification (CIS) for a signal detector. It is an example of the contents and level of detail of information in a CIS. The classes, interfaces, and data types in this report reflect current understanding of system concepts and potential implementation patterns but should not be interpreted as containing the finalized interface specifications, etc.

More Details

US NDC Modernization Iteration E2 Prototyping Report: OSD & PC Software Infrastructure

Prescott, Ryan M.; Marger, Bernard L.; Chiu, Ailsa

During the second iteration of the US NDC Modernization Elaboration phase (E2), the SNL US NDC Modernization project team completed follow-on COTS surveys & exploratory prototyping related to the Object Storage & Distribution (OSD) mechanism, and the processing control software infrastructure. This report summarizes the E2 prototyping work.

More Details

US NDC Modernization Iteration E1 Prototyping Report: Processing Control Framework

Prescott, Ryan M.; Hamlet, Benjamin R.

During the first iteration of the US NDC Modernization Elaboration phase (E1), the SNL US NDC modernization project team developed an initial survey of applicable COTS solutions, and established exploratory prototyping related to the processing control framework in support of system architecture definition. This report summarizes these activities and discusses planned follow-on work.

More Details

IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case)

Harris, James M.; Prescott, Ryan M.; Dawson, Jericah M.; Huelskamp, Robert M.

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

More Details

US NDC Modernization Project Expert Review Panel Report

Prescott, Ryan M.

AFTAC and the SNL US NDC modernization project team hosted a two-day expert review panel meeting September 30th & October 1st, 2014 to solicit input from subject matter experts regarding the technical direction and current design concepts proposed for the modernized US NDC system. This report documents the panel’s recommendations captured during the review.

More Details
25 Results
25 Results