Publications

3 Results

Search results

Jump to search filters

AT-400A compliance test report

Glass, R.E.

In 1993 Sandia was directed to design containers for the long-term storage and transport of nuclear weapons origin fissile material. This program was undertaken at the direction of the US Department of Energy and in cooperation with Lawrence Livermore National Laboratory and Los Alamos National Laboratory. Lawrence Livermore National Laboratory and Los Alamos National Laboratory were tasked with developing the internal fixturing for the contents. The hardware is being supplied by AlliedSignal Federal Manufacturing and Technologies, and the packaging process has been developed at Mason and Hanger Corporation`s Pantex Plant. The unique challenge was to design a container that could be sealed with the fissile material contents; and, anytime during the next 50 years, the container could be transported with only the need for the pre-shipment leak test. This required a rigorous design capable of meeting the long-term storage and transportation requirements. This report addresses the final testing that was undertaken to demonstrate compliance with US radioactive materials transport regulations.

More Details

H1616 supplemental compliance test report

Glass, R.E.

Sandia National Laboratories designed the H1616 container for transport of Type B quantities of radioactive materials. During the most recent recertification cycle, questions were raised concerning the ability of drum type containers with locking rings to survive the hypothetical accident sequence when the puncture test was oriented to specifically attack the locking ring. A series of tests has been performed that conclusively demonstrates that the specially designed locking ring on the H1616 performs adequately in this environment.

More Details

Ensuring the 50 year life of a fissile material container

Glass, R.E.

Sandia was presented with an opportunity in 1993 to design containers for the long term storage and transport of fissile material. This program was undertaken at the direction of the US Department of Energy and in cooperation with Lawrence Livermore National Laboratory and Los Alamos National Laboratory which were tasked with developing the internal fixturing for the contents. The hardware is being supplied by Allied Signal Federal Manufacturing and Technologies, and the packaging will occur at Mason and Hangar Corporation`s Pantex Plant. The unique challenge was to design a container that could be sealed with the fissile material contents; and, anytime during the next 50 years, the container could be transported with only the need for the pre-shipment leak test. This required not only a rigorous design capable of meeting the long term storage and transportation requirements, but also resulted in development of a surveillance program to ensure that the container continues to perform as designed over the 50-year life. This paper addresses the design of the container, the testing that was undertaken to demonstrate compliance with US radioactive materials transport regulations, and the surveillance program that has been initiated to ensure the 50-year performance.

More Details
3 Results
3 Results
Top