Thunder Test Facility in Coyote Test Field Memo
This is a summary of tests Thunderpipe, Thunderwell, and Tundertube tests in the Coyote
This is a summary of tests Thunderpipe, Thunderwell, and Tundertube tests in the Coyote
Abstract not provided.
Sandia agreed to determine test velocities and temperatures and propose a test sequence for the 15 aerodynamically unstable capsules.
Abstract not provided.
Quotes the Cook to Reeves TWX which discussed the understanding of the treaty ending nuclear tests, need for taking into account meteorology in connection with underground explosions, and a statement of successful stemming of tests.
Discusses understanding of the treaty ending nuclear tests, need for taking into account meteorology in connection with underground explosions, and a statement of successful stemming of tests.
Letter of transmittal for SOW pertaining to stockpile testing of W48/M454 system.
Comments on SNAP-9 mission and related space nuclear power safety concerns.
A response to two memos-- concerns about inexperience in the generation and photographic study of extremely strong shocks which were of interest to the Bagpipe-ARES programs made it difficult to specify just what unique date was expected.
This is just a lits of items for the meeting.
A proposed review and technical objectives development program of Sandia Corporation plans for weapons effects test activities along with their funding requirements, etc.
Mr. Cook states his interest in the specific technical objectives of the planned horizontal asymmetry shot, the arguments for placing it above the high yield scaling test, and of the apparent interest in E. Teller`s interest.
A mathematical developed probabilities chart to show the effect of different mixes of weapons and decoys (or the equivalent in other penetration aids).
About a new facility and construction expenses. It was to be for experimenting in relation to space nuclear power safety re-entry concerns.
Report about space flight testing & SNAP related safety items.
Space power/nuclear powered missile flight test scheduling and purpose of the trip.
Abstract not provided.
Project authorization, program status, and planned expenditures.
Project authorization, program status, and planned expenditures.
Project authorization, program status, and planned expenditures.
Abstract not provided.
Flight tests (for SNAP) rescheduling: laboratory test run-throughs of complete flight test re-entry systems with all live hardware, tower drops into water for evaluations of impact switches and flotation gear, RV radiant heat test, sled tests, air drops.
About fuel capsule testing for SNAP program.
About the SNAP-11 system mission requirements and safety.