Basic Data Report for Drillholes on the H-19 Hydropad (Waste Isolation Pilot Plant--WIPP)

Beauheim, Richard L.

Seven holes were drilled and wells (H-19b0, H-19b2, H-19b3, H-19b4, H-19b5, H-19b6, and H-19b7) were constructed on the H-19 hydropad to conduct field activities in support of the Culebra Transport Program. These wells were drilled and completed on the Waste Isolation Pilot Plant (WIPP) site during February to September 1995. An eighth hole, H-19b1, was drilled but had to be abandoned before the target depth was reached because of adverse hole conditions. The geologic units penetrated at the H-19 location include surficial deposits of Holocene age, rocks from the Dockum Group of Upper Triassic age, the Dewey Lake Redbeds, and Rustler Formation of the Permian age. The Rustler Formation has been further divided into five informal members which include the Forty-niner Member, Magenta Member, Tamarisk Member, Culebra Dolomite Member, and an unnamed lower member. The Rustler Formation, particularly the Culebra Dolomite Member, is considered critical for hydrologic site characterization. The Culebra is the most transmissive saturated unit above the WIPP repository and, as such, is considered to be the most likely pathway for radionuclide transport to the accessible environment in the unlikely event the repository is breached. Seven cores from the Culebra were recovered during drilling activities at the H-19 hydropad and detailed descriptions of these cores were made. On the basis of geologic descriptions, four hydrostratigraphic units were identified in the Culebra cores and were correlated with the mapping units from the WFP air intake shaft. The entire length of H-19b1 was cored and was described in detail. During coring of H-19b1, moisture was encountered in the upper part of the Dewey Lake Redbeds. A 41-ft-thick section of this core was selected for detailed description to qualify the geologic conditions related to perched water in the upper Dewey Lake. In addition to cuttings and core, a suite of geophysical logs run on the drillholes was used to identify and correlate different lithologies among the seven wells.

More Details

Analysis of hydraulic tests of the Culebra and Magenta Dolomites and Dewey Lake Redbeds conducted at the Waste Isolation Pilot Plant Site

Beauheim, Richard L.

This report presents interpretations of hydraulic tests conducted at 15 well locations in the vicinity of the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico between 1980 and 1996. The WIPP is a US Department of Energy (DOE) facility to demonstrate safe disposal of transuranic wastes arising form the nation`s defense programs. The WIPP repository lies within bedded halite of the Salado Formation, 2,155 ft below ground surface. The tests reported herein were, with two exceptions, conducted in the Culebra Dolomite member of the Rustler Formation, which overlies the Salado Formation. The remaining tests were conducted in the Magenta Member of the Rustler and in the overlying formation, the Dewey Lake Redbeds. This report completes the documentation of hydraulic-test interpretations used as input to the WIPP Compliance Certification Application (US DOE, 1996).

More Details

Hydraulic testing of Salado Formation evaporites at the Waste Isolation Pilot Plant site: Second interpretive report

Beauheim, Richard L.

Pressure-pulse, constant-pressure flow, and pressure-buildup tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Transmissivities have been interpreted from six sequences of tests conducted on five stratigraphic intervals within 15 m of the WIPP underground excavations.

More Details

Interpretations of single-well hydraulic tests of the Rustler Formation conducted in the vicinity of the Waste Isolation Pilot Plant site, 1988--1989

Beauheim, Richard L.

This report presents the results of single-well hydraulic tests performed in seven wells in the vicinity of the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico in 1988 and 1989. The tests discussed in this report were performed in four of the five members of the Rustler Formation. The tests include: a slug-withdrawal test of the unnamed lower member of the Rustler ate well H-16; slug-withdrawal and slug-injection tests of the Culebra Dolomite Member at well AEC-7; slug-injection tests of the Culebra at well D-268; a pumping test of the Culebra at well H-18; pulse-injection, slug-injection, and slug-withdrawal tests of Magenta Dolomite Member at well H-2b1; pulse-withdrawal, slug-withdrawal, and slug-injection tests of the Magenta at well H-3b1; and pulse-withdrawal and slug-withdrawal tests of the Forty-niner Member at well H-3d. The tests were intended to provide data on the transmissivities of the Rustler members for use in regional-scale modeling of groundwater flow through the Rustler.

More Details

Interpretation of brine-permeability tests of the Salado Formation at the Waste Isolation Pilot Plant site: First interim report

Beauheim, Richard L.

Pressure-pulse tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Hydraulic conductivities ranging from about 10{sup {minus}14} to 10{sup {minus}11} m/s (permeabilities of about 10{sup {minus}21} to 10{sup {minus}18} m{sup 2}) have been interpreted from nine tests conducted on five stratigraphic intervals within eleven meters of the WIPP underground excavations. Tests of a pure halite layer showed no measurable permeability. Pore pressures in the stratigraphic intervals range from about 0.5 to 9.3 MPa. An anhydrite interbed (Marker Bed 139) appears to be one or more orders of magnitude more permeable than the surrounding halite. Hydraulic conductivities appear to increase, and pore pressures decrease, with increasing proximity to the excavations. These effects are particularly evident within two to three meters of the excavations. Two tests indicated the presence of apparent zero-flow boundaries about two to three meters from the boreholes. The other tests revealed no apparent boundaries within the radii of influence of the tests, which were calculated to range from about four to thirty-five meters from the test holes. The data are insufficient to determine if brine flow through evaporites results from Darcy-like flow driven by pressure gradients within naturally interconnected porosity or from shear deformation around excavations connecting previously isolated pores, thereby providing pathways for fluids at or near lithostatic pressure to be driven towards the low-pressure excavations. Future testing will be performed at greater distances from the excavations to evaluate hydraulic properties and processes beyond the range of excavation effects.

More Details

Interpretation of H-11B4 hydraulic tests and the H-11 multipad pumping test of the Culebra dolomite at the Waste Isolation Pilot Plant (WIPP) site

Beauheim, Richard L.

Drillstem tests, slug tests, a small-scale pumping test, and a large-scale pumping test of the Culebra Dolomite Member of the Rustler Formation were performed in 1988 at the H-11 hydropad at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. The drillstem, slug, and small-scale pumping tests were conducted in well H-11b4 to evaluate well and aquifer properties in preparation for a tracer test. The large-scale pumping test, known as the H-11 multipad test, was performed by pumping well H-11b1 in the southern part of the WIPP site at a rate of six gpm for 63 days and monitoring drawdown and recovery responses in three other wells on the H-11 hydropad and at 11 observation wells within a three-mile radius. Responses were observed in 10 of these distant wells. The H-11 multipad pumping test complemented the H-3 and WIPP-13 multipad pumping tests conducted in the central and northern portions of the WIPP site in late 1985 and early 1987, respectively. 67 refs., 124 figs., 31 tabs.