Publications Details
Summary of field operations, well TRN-1
Fritts, J.E.; Thomas, E.; Mccord, J.P.
TRN-1 was drilled near the SE corner of Kirtland Air Force Base to a depth of 510 feet. This well is in the Site-Wide Hydrogeologic Characterization task field program, which is part of Sandia`s Environmental Restoration Project. After drilling, the borehole was logged, plugged to a depth of 352 ft, and completed as a monitoring well. Sand pack interval is from 305 to 352 ft and the screen interval is from 320 to 340 ft. During field operations, important subsurface geologic and hydrologic data were obtained (drill cuttings, geophysical logs of alluvial cover). Identification of the Abo formation in the subsurface will be useful. The subsurface hydrologic data will help define the local hydrostratigraphic framework within the bedrock. Future aquifer testing will be conducted for transmissivity, etc.