Publications Details

Publications / Conference

Re-START: The second operational test of the String Thermionic Assembly Research Testbed

Wyant, Francis J.

The second operational test of the String Thermionic Assembly Research Testbed -- Re-START -- was carried out from June 9 to June 14, 1997. This test series was designed to help qualify and validate the designs and test methods proposed for the Integrated Solar Upper Stage (ISUS) power converters for use during critical evaluations of the complete ISUS bimodal system during the Engine Ground Demonstration (EGD). The test article consisted of eight ISUS prototype thermionic converter diodes electrically connected in series.