Publications Details
Memo in Regards to Rumpler Design Requirements
Assignment of the designing of a cable release and depth sensing device for the Rumpler to Division 1321 and M. D. Perkins (engineer).
Assignment of the designing of a cable release and depth sensing device for the Rumpler to Division 1321 and M. D. Perkins (engineer).