Publications Details
Feature, Event, and Process Screening and Scenario Development for the Yucca Mountain Total System Performance Assessment
Swift, Peter N.; Barr, George E.; Barnard, R.; Rechard, Robert P.
Scenario development has two primary purposes in the design and documentation of post-closure performance assessments in a regulatory setting. First, scenario development ensures a sufficiently comprehensive consideration of the possible future states of the system. Second, scenario development identifies the important scenarios that must be considered in quantitative analyses of the total system performance assessment (TSPA). Section 2.0 of this report describes the scenario development process. Steps in the process are described in Section 2.1, and terms introduced in this section are defined in Section 2.2. The electronic database used to document the process is described in Section 3, and Section 4 provides a summary of the current status of the YMP scenario development work. Section 5 contains acknowledgments, and Section 6 contains a list of the references cited.