Publications Details
Closeout Briefing for PSL Technical Survey of MSTS SCP (JASPER) [PowerPoint]
NNSA Order 56XB (Chapter 13.2) requires the Primary Standards Laboratory (PSL) to perform technical surveys on the integrated contractors participating in the NNSA Standards and Calibration Program. In addition to Chapter 13.2, the surveys check for compliance with ISO/IEC 17025 and the PSLM. The PSL Technical Survey is a joint activity of the NNSA and the PSL. The PSL is responsible for the technical portion of the survey and the NNSA is responsible for the quality portion. The Technical Survey report is issued by the NNSA.