Publications Details

Publications / Conference

A{prime} (A-PRIMED): A case study in teamwork

Ashby, Rodema

June 1993, the A-PRIMED project (Agile Product Realization of electrMEchanical Devices) was formed with a concurrent engineering team of product designers, analysts, CNC machinists, robotic assembly scientists, electronics communications developers, statisticians and human factors scientists at Sandia National Laboratories, to develop and demonstrate a process for a much faster design-to-production cycle for precision electromechanical devices. The team had to develop the culture and infrastructure to support communications between remotely located members, as well as demonstrate a shortened cycle time made possible by developing new technologies. These new technologies were then adopted by the team and introduced to their work partners to support new work processes. By March 1995, the A-PRIMED team has used the new technologies and work processes to design and build qualified new products in only 24 days.