Publications Details
Borehole closure and test zone volume determination program for brine-permeability test results within the Waste Isolation Pilot Plant underground facility
Jensen, A.L.
Until recently, hydrologic characterization in closed sections of boreholes at the Waste Isolation Pilot Plant (WIPP) has relied on measurements of pressure and temperature to establish the permeability of the host geological formations. There were no provisions for monitoring tool compliance and salt creep resulting from borehole closure. The new permeability test tool used to characterize the WIPP underground facility has been equipped with a series of sensors to measure the movement of the tool with respect to the borehole and borehole wall movement. A FORTRAN program can interpret the output data from each test and calculate the change in borehole radius, test zone length, and test zone volume. These values provide a correlation of fluid compressibility and tool compliance with the permeability results derived from the test data. 4 figs., 3 tabs.