Scaled Wind Farm Technology Facility Overview
Abstract not provided.
Abstract not provided.
Abstract not provided.
Wind Energy
Offshore wind turbines are an attractive source for clean and renewable energy for reasons including their proximity to population centers and higher capacity factors. One obstacle to the more widespread installation of offshore wind turbines in the USA, however, is that recent projections of offshore operations and maintenance costs vary from two to five times the land-based costs. One way in which these costs could be reduced is through use of a structural health and prognostics management (SHPM) system as part of a condition-based maintenance paradigm with smart loads management. Our paper contributes to the development of such strategies by developing an initial roadmap for SHPM, with application to the blades. One of the key elements of the approach is a multiscale simulation approach developed to identify how the underlying physics of the system are affected by the presence of damage and how these changes manifest themselves in the operational response of a full turbine. A case study of a trailing edge disbond is analysed to demonstrate the multiscale sensitivity of damage approach and to show the potential life extension and increased energy capture that can be achieved using simple changes in the overall turbine control and loads management strategy. Finally, the integration of health monitoring information, economic considerations such as repair costs versus state of health, and a smart loads management methodology provides an initial roadmap for reducing operations and maintenance costs for offshore wind farms while increasing turbine availability and overall profit.
51st AIAA Aerospace Sciences Meeting including the New Horizons Forum and Aerospace Exposition 2013
Sandia National Laboratories has concluded field testing of its wind turbine rotor equipped with trailing-edge flaps. The blade design, fabrication, and integration which have been described in previous papers are briefly reviewed and then a portion of the data is presented and analyzed. Time delays observed in the time-averaged response to stepwise flap motions are consistent with the expected time scales of the structural and aerodynamic phenomena involved. Control authority of the flaps is clearly seen in the blade strain data and in hub-mounted video of the blade tip movement. © 2013 by the American Institute of Aeronautics and Astronautics, Inc.
Abstract not provided.
A basic structural concept of the blade design that is associated with the frequently utilized %E2%80%9CNREL offshore 5-MW baseline wind turbine%E2%80%9D is needed for studies involving blade structural design and blade structural design tools. The blade structural design documented in this report represents a concept that meets basic design criteria set forth by IEC standards for the onshore turbine. The design documented in this report is not a fully vetted blade design which is ready for manufacture. The intent of the structural concept described by this report is to provide a good starting point for more detailed and targeted investigations such as blade design optimization, blade design tool verification, blade materials and structures investigations, and blade design standards evaluation. This report documents the information used to create the current model as well as the analyses used to verify that the blade structural performance meets reasonable blade design criteria.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Operations and maintenance costs for offshore wind plants are expected to be significantly higher than the current costs for onshore plants. One way in which these costs may be able to be reduced is through the use of a structural health and prognostic management system as part of a condition based maintenance paradigm with smart load management. To facilitate the creation of such a system a multiscale modeling approach has been developed to identify how the underlying physics of the system are affected by the presence of damage and how these changes manifest themselves in the operational response of a full turbine. The developed methodology was used to investigate the effects of a candidate blade damage feature, a trailing edge disbond, on a 5-MW offshore wind turbine and the measurements that demonstrated the highest sensitivity to the damage were the local pitching moments around the disbond. The multiscale method demonstrated that these changes were caused by a local decrease in the blades torsional stiffness due to the disbond, which also resulted in changes in the blades local strain field. Full turbine simulations were also used to demonstrate that derating the turbine power by as little as 5% could extend the fatigue life of a blade by as much as a factor of 3. The integration of the health monitoring information, conceptual repair cost versus damage size information, and this load management methodology provides an initial roadmap for reducing operations and maintenance costs for offshore wind farms while increasing turbine availability and overall profit.
European Wind Energy Conference and Exhibition 2012, EWEC 2012
Sixty-three years of aero-hydro-elastic loads simulations are demonstrated for a 5 MW offshore wind turbine deployed in shallow water. This large amount of simulation was made possible through the use of a high-performance computing cluster. The resulting one-hour extreme load distributions are examined; the extensive number of one-hour realizations allows for direct estimation of fifty-year return loads, without resorting to extrapolation. This type of simulation study opens up new possibilities for developing wind turbine design standards and discovering physical mechanisms that lead to extreme loads on wind turbine components.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
50th AIAA Aerospace Sciences Meeting Including the New Horizons Forum and Aerospace Exposition
A high-performance computer was used to simulate ninety-six years of operation of a five megawatt wind turbine. Over five million aero-elastic simulations were performed, with each simulation consisting of wind turbine operation for a ten minute period in turbulent wind conditions. These simulations have produced a large database of wind turbine loads, including ten minute extreme loads as well as fatigue cycles on various turbine components. In this paper, the extreme load probability distributions are presented. The long total simulation time has enabled good estimation of the tails of the distributions down to probabilities associated with twenty-year (and longer) return events. The database can serve in the future as a truth model against which design-oriented load extrapolation techniques can be tested. The simulations also allow for detailed examination of the simulations leading to the largest loads, as demonstrated for two representative cases.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.