Thermal Transport Gen3 Liquid-Pathway Funds Re-Allocation Proposal
Further development of the Gen3 Liquid-Pathway project is necessary to address technical engineering challenges with respect to incorporation of a flow control valve and sodium system for the 2.0 MWth Pilot-Scale system. For the Thermal Transport development task 1.3, Sandia National Laboratories (SNL) originally set aside $\$$388,425 for the development of a heat trace test bed, however while the team felt that this work is necessary to de-risk a number critical design-related issues the team also has identified items that require more near-term attention. These items largely pertain to the Chloride molten salt values development, with operation up to 720°C, as well as operational mode/system design development as it pertains to the sodium system design, which is currently not included as part of the system design work. The Gen 3 project team requests the ~$\$$388k of funds be used to address these issues, where the previous work requested may be addressed with the 300kWth chloride molten salt loop. These funds would only be spent during the remainder of the Phase 1 budget period, in preparation of final design work for the Phase 2 portion of the project. For the Budget Summary below, please note that the values are burdened values and not raw values, so the actual values going to the entities will be less due to National Laboratory tax costs.