Publications

6 Results

Search results

Jump to search filters

The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Data Report

Passell, Howard D.; Barber, David S.; Betsill, J.D.; Littlefield, Adriane L.; Matthews, Robert F.; Mohagheghi, Amir H.; Shanks, Sonoya T.

The Navruz Project is a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan, and facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. The Project also collects data on basic water quality parameters. Data obtained in this project are shared among all participating countries and the public through a world-wide web site (http://www.cmc.sandia.org/Central/centralasia.html), and are available for use in further studies and in regional transboundary water resource management efforts. This report includes graphs showing selected data from the Fall 2000 and Spring 2001 sampling seasons. These data include all parameters grouped into six regions, including main rivers and some tributaries in the Amu Darya and Syr Darya river systems. This report also assembles all data (in tabular form) generated by the project from Fall 2000 through Fall 2001. This report comes as the second part of a planned three-part reporting process. The first report is the Sampling and Analysis Plan and Operational Manual, SAND 2002-0484. This is the second report.

More Details

The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

Passell, Howard D.; Barber, David S.; Betsill, J.D.; Littlefield, Adriane L.; Mohagheghi, Amir H.; Shanks, Sonoya T.

The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

More Details

Applying the Laboratory Integration and Prioritization System (LIPS) to decision-making at Sandia National Laboratories

Barber, David S.

The Laboratories Services Division of Sandia National Laboratories includes a wide variety of operations such as environmental, safety and health, safeguards and security, facilities, logistics, and sites planning and integration. In the face of declining budgets and increasing requirements, the Management Team needed some tools to assist in negotiating with customers and regulators and in consistently and cost-effectively managing all work performed and/or managed by the Division. The Integrated Services Management System (ISMS) was developed as a series of processes to provide these tools. The Laboratory Integration and Prioritization System (LIPS) was selected as the prioritization methodology for ISMS. The pilot application phase was begun in February 1994 and addressed planning of work and resources for FY95. Extensive training was provided for the Activity Data Sheet (ADS) preparers and the teams which would score each of the activities. After preparation of the ADSs, they were scored by the scoring teams. A division-wide review board reviewed all of the ADSs to ensure consistency of scoring across all of the functional areas. The lessons that were learned from the pilot application were evaluated and improvements incorporated for the FY96 planning and application. The improvements included upgrading the training, providing expert facilitation for scoring boards, modification of the scoring instructions to better represent local situations, and establishing an Validation Board with more authority and accountability to provide quality assurance. The participants in the LIPS process have agreed that no major bases were uncovered, imperfect prioritizations are better than no data, all work packages can be scored and ranked, including core activities, results were objective and quantifiable, and decisions could be made using technically defensible bases.

More Details
6 Results
6 Results