Sandia LabNews

Solution to high-energy costs could lie underground


Image of pic3.jpg

Sandia researcher Georgianne Peek (6336) thinks a possible solution to high energy costs lies underground. And it’s not coal or oil.

It’s compressed air energy storage (CAES).

“Until recently energy has been relatively inexpensive. But now prices are rising dramatically, and we need solutions,” Georgianne says. “CAES and other storage technologies are not the only answer to our energy needs, but they can be an important part of the solution.”

CAES facilities function like big batteries. Electric motors drive compressors that compress air into an underground geologic formation during off-peak electric use times like evenings and weekends. Then, when electricity is needed most during high-demand times, the precompressed air is used in modified combustion turbines to generate electricity. Natural gas or other fossil fuels are still required to run the turbines, but the process is more efficient. This method uses up to 50 percent less natural gas than standard electricity production.

While the concept of compressed air energy storage is more than 30 years old, only two such plants exist — a 17-year-old facility in McIntosh, Ala., located about 40 miles north of Mobile, and a 30-year-old plant in Germany, both in caverns in salt domes. A third is being developed near Des Moines, Iowa, in an aquifer. In addition, the Public Service Company of New Mexico (PNM) and several other US utilities are considering CAES to help mitigate potential problems associated with the high proportion of wind generation in their systems.

Iowa project management

Sandia is currently managing DOE money to support the design of the Iowa facility, called the Iowa Stored Energy Park (ISEP). Georgianne is the project manager. Developers include more than 100 municipal utilities in Iowa, Minnesota, and the Dakotas.

ISEP will be a nominal 268 MW/13,400 MWh CAES plant with about 50 hours of storage. It will utilize the abundant wind generation already in Iowa to charge the plant. When ISEP is up and running, it could account for 20 percent of the energy used in a year at a typical municipal Iowa utility and could save cities and their utilities as much as $5 million each year in purchased energy.

Georgianne says the Iowa project is pretty far along and is expected to be operational by 2012.

“One of the most important tasks that has to be done before a CAES facility can be built is to find a geologic formation that will support it,” Georgianne says. “ISEP developers are 95 percent sure that they have the right formation, based on the seismic testing at the site, computer modeling, and data from a sister formation.”

Sandia to study core samples

This summer multiple core samples from the potential Iowa aquifer CAES site will be taken and sent to Sandia for analysis by a team led by Steve Bauer (6315). The analysis will include collection and assessment of the geologic, hydrologic, and rock physics data in the geomechanics laboratory. The data will provide necessary fundamental information used for the design and performance of the underground air storage vessel.

In 2000 Steve did similar analysis of rock mechanics of a limestone mine in Norton, Ohio, that was being studied for a potential CAES facility. That project is still under development.

Georgianne says that PNM is also considering building a CAES plant and is exploring possible locations around the state, including locations near existing wind farms that provide service to PNM.

“Wind often blows at night,” she says. “As electricity is produced at night from the wind farms, it will be stored and eventually make its way into PNM’s transmission lines.”

Several Sandia researchers and the Electric Power Research Institute Initiative are helping PNM plan for a CAES facility.

CAES technology development can trace its roots to the early 1960s when evaluation of gas turbine technology for power production began. The technology gained momentum during the next decade due to its promising fuel efficiency and response capabilities to provide load-following and peaking power support.

Now utilities are starting to tie CAES technology to wind power — first with the Iowa plant and soon with a possible facility in New Mexico, Georgianne says.