- A&F Locks
- Access Control
- Administrative Controls
- Alarms
- Anomalous Condition OP
- Appropriate Scales
- Appropriate vehicle
- Approved Circuit Tester
- Approved Containers/Packaging
- Approved Electrical Equip.
- Approved Equip for Personnel on Elevated Surf.
- Approved Operating Facility
- Approved Recovery Safety Plan (DTRA/EOD)
- Approved Storage Facility
- Checklists
- Compatibility
- Compatible Cleaning agent (inspection)
- Conduct of OPs
- Cotton Clothing
- Current Limiting Instrumentation
- Detonator / Charge Separation
- Detonator Simulator Covers
- Dry Runs
- EBW Detonators (ESD, RF, Stray Voltage Insensitive)
- Explosive Inventory System (EIS)
- Site Plan
- Smoke Removal Filter
- Temperature Control
- Tie Downs
- Tools, Battery Operated
- Tools, Non-Spark
- Tools, Pneumatic
- Training
|
- Emergency Communications
- Energy Isolation Controls/Key Control
- Engineering Analysis
- Engineering Controls
- EOD Assistance (primary control)
- ESD Insensitive Energetic Materials
- Exclusion Zone
- Explosive Neutralization
- Explosive Qualifications
- Explosive Rated Equip.
- Explosive Waste Stream
- Fire & Medical Support
- Fire Extinguisher
- Fire Fighting Equipment
- Flight Termination System
- Grounding Certification
- Ground Straps
- Grounding / Bonding Verification
- High Security Lock
- Housekeeping
- Independent Verification
- Interlocks
- Launcher Load Test
- Launcher Shelter (weather protection)
- LEWS (PGEWS)
- Lightning Protection
- Limited Personnel Exposure
- Limits – Explosives
- Limits – Personnel
- Limits - Range
- Minimal Time on Site
- TWD for Mis-Fire / No-fire
- TWDs
- Two-man rule
- Ventilation
- Video Surveillance
- Wait-Period (Mis-Fire)
|
- Muster Log
- Noise Reduction
- Notifications / CFAC
- No-Voltage Check
- Out of Line Voltage to Fuze
- Personal Hygiene
- Postings / Signage
- PPE
- Pre/Post Job Briefing
- Previous Testing Experience
- Protective Gloves
- Quantity Distance Analysis (QDA)
- Quantity Distance Arc
- Remote Firing
- Remote Mixing
- Remote Operations
- Remote Power Switching
- RF Control
- Rigging – Critical Lift Plan
- Rigging - Pre-engineered Lift
- Rigging - Qualified Handlers
- Safe/Arm Device
- Safety Analysis for Range
- Security (area control)
- Self-Contained / Main Charge
- Self-Contained XPL-Components
- Separation, Charge & Control
- Shielding (Boom-Box)
- Shorting / Shunting
- Warning Devices / Announcements
- Weather Conditions
- Weather Data Monitoring
- Work Schedule Limitations
- Wrist Straps
|